You don't have javascript enabled. Good luck with that.
Pencarian
JPO Jembatan Gantung Rusak Parah

Cengkareng JPO Looks Slightly Sloping

The condition of the people pedestrian (JPO) in Cengkareng is pretty worrying.

The bridge iron slightly sloping because of the passing heavy truck. The truck also had stuck

Relaying on Beritajakarta.com's data, the concrete iron that crosses over the road seen dented and its bridge slightly sloping. Even, its floor rivet nail also looks dislodged. Whereas, there is a Transjakarta bus stop.

Haris (47), a motorcycle taxi driver near the bridge said, it is due to the passing heavy truck. 

Unworthy JPOs will Be Eliminated

"The bridge iron slightly sloping because of the passing heavy truck. The truck also had stuck," he expressed, Monday (9/26).

West Jakarta Transportation Sub-dept Head, Anggiat Banjarnahor asserted already know the bridge condition. He also has coordinated with Transportation Dept for reparation.

"Talk about reparation, it lies in dept. And according to the authority, I have reported it to the dept about reparation so it depends on them," he said. 

Linked News
Popular News indeks
  1. Attending Betawi Eid 2026, Pram Encourages Strengthening Cultural Values

    access_time11-04-2026 remove_red_eye1071 personFolmer
  2. Low Emission Zones: Jakarta’s Concrete Step to Curb Air Pollution

    access_time13-04-2026 remove_red_eye954 personAldi Geri Lumban Tobing
  3. Jakpro Promotes Integration Between JIS and KRL Station

    access_time10-04-2026 remove_red_eye848 personAldi Geri Lumban Tobing
  4. Cilandak Health Center Maintains Optimal Services

    access_time10-04-2026 remove_red_eye813 personTiyo Surya Sakti
  5. Palmeriam Market Adopts QRIS Digital Payment System

    access_time08-04-2026 remove_red_eye714 personNurito